Skip Ribbon Commands
Skip to main content
Skip Navigation LinksHome

Skip Navigation LinksANSI Procedural Revisions-Check Standards Action: August 10, 2009 Public Comment Deadline

  
  
Description
Description 2
  
  
  
Proposed revision to 2.1 Openness of the ER
Proposed revision to clause 2.1 Openness of the ANSI Essential Requirements

The ANSI ExSC was asked to confirm whether the names of individuals must be made available upon request if the ANS consensus body membership is by organization.
In general, the ExSC agreed that as part of a consensus body roster that is publicly available per clause 2.1, a point of contact should be listed with the name of the organization that is a voting member of the consensus body.
7/10/20097/10/2009 7:15 AM
  
Proposed revision to clause 4.4 of the ANSI ER
Proposed revision to clause 4.4 Designation of American National Standards of the ANSI Essential Requirements:  Due process requirements for American National Standards
The revision is intended to clarify current requirements that portions of a document that were not approved through the ANS process shall be so labeled and shall not include provisions that are required for conformance to an ANS.
7/10/20097/10/2009 7:13 AM
  
Proposed revision to 4.2.1.3.4  Withdrawal for Cause of the ER
Note:  this is a revision of ExSC 6966, which was announced for public comment in March 6, 2009 issue of Standards Action.
A consequence of a remand and of a failure to satisfy ANSI’s due process requirements can be the withdrawal of an existing ANS.
7/10/20097/10/2009 7:14 AM